MINAB IRRIGATION PREFAB CHANNELS
This
This project was assigned to the Bureau by Hormozgan Water Authorities. The projects obtained of 14 km of grade 3 and 4 irrigation open channels and all related structures such as distributers, turn-outs, cross-overs, underpasses, siphons and etcetera. The project was located in south of Minab Dam, Hormozgan Providence. All pieces of channel and structures were pre-fabricated in site and installed and grouted in place. The job was completed in 12 months and handed over to the client in 1985 and now is operational.